DodgeTalk Forum banner

Status
Not open for further replies.
1 - 9 of 9 Posts

·
Registered
Joined
·
55 Posts
Discussion Starter #1
Does anyone know what D status means with a new truck build? I emailed dodge and they said it was in D status but no explanation.-Thanks
 

·
Registered
Joined
·
95 Posts
Don't know what the code means, but I know the factory is still closed until next week, so every build order is pending. Hoping the factory opens when planned, as they have announced some factories are staying closed another week or so.
 

·
Registered
Joined
·
139 Posts
As far as I know the Ram factory will start up again on the 20th, so next Tuesday.
 

·
2009 Ram 1500 CC Laramie
Joined
·
600 Posts

·
Clinically Certified
Joined
·
735 Posts

·
Registered
Joined
·
35,850 Posts
Unscheduled:
BX - good order available for scheduling
BB - fleet order only - review by bid department
BD - special equipment processing
BE - edit error - coding error which must be corrected before order can be scheduled
BG - order has passes edit but cannot be scheduled regardless of sold status
Reason Codes:
F - finance hold - automatic cancellation after 15 days
B - model or option build out
L - material restriction
M - material hold (fleet)
ZA - canceled order
Scheduled:
C - tentative schedule
D - firm schedule: serial number assigned, approx time in station - 5 days
D1 - gateline: unit sequenced for production, est ship date assigned, Approx time in station - 12 days
Build:
E - framing
F - paint
G - trim
Built:
I - unit built, pending final inspection
J - vehicle passed final inspection but not released to carrier
JB - shipped to body vendor
JE - shipped to emissions
JJ - consigned to body vendor
JS - shipped to storage
KZ - released by plant and invoiced
Traffic Codes:
KZ L - released but not shipped
KZ M - first rail departure
KZ N - first rail arrival
KZ O - delayed/received
KZ OA - plant hold, quality audit
KZ OB - zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC - carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD - mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE - misdropped or misshipped vehicle
KZ OF - shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG - damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH - all other "O" type carrier codes
KZ T - second rail departure
KZ U - second rail arrival
KZ X - delivered to dealer
KZ Y1 - major damage - must not be sold as new
KZ Y2 - major damage - vehicle sold at auction
 

·
Registered
Joined
·
35,850 Posts
In D status your dealer should have a build date on their print out they get each day. Some dealers are too lazy to look or just won't tell you.
 
1 - 9 of 9 Posts
Status
Not open for further replies.
Top